1 Installation and Operation Manual Northwind Blast Chiller Models: 500 and 1000 1-800-24 BALLY Bally Refrigerated
10 deflecting the flow of air from the fan frame assembly to the coil frame assembly. Prior to installing, prepare 1/8” pilot holes and use ¾” stainl
11 7.3 Installing the Fan Frame Assembly 1. First remove the fan guard. 2. Install the frame in the appropriate side and screw the back braces to
12 7.5 Installing the Plenum Supports and Plenum 1. At this point, the Front Plenum Support, Fan Seal Strip, and Coil Top Trim should be in place. A
13 *The priority should be in that order, if the Coil Top Trim holes won’t match up when the plenum is screwed to the Front, unscrew the Coil Frame fr
OPERATIONAL MANUAL: BALLY NORTHWINDS BLAST CHILLERBEFORE TURNING THE CONTROLLER ON, ensure that all wire connections are secure and correctly color c
6. The Display Screens in Automatic Mode:While in automatic, you can push the Next/Previous buttons on the display to page through information approp
Northwinds Blast Chiller Operations Manual 2013 © Bally Refrigerated Boxes, Inc. 16Screen Reads Appears When Measured Temperatures: Show temperatu
A Northwind 500 Model is shown. A Northwind 1000 Model is twice as deep. Northwinds Blast Chiller Operations Manual 2013 © Bally Refrigerated Boxes,
2 Introduction READ ENTIRE MANUAL BEFORE BEGINNING INSTALLATION! • There are 9 steps to the installation process. This manual gives you a corre
3 Table of Contents Title Page Number Introduction 1 Tool List 4 Parts List 4
4 Note: 012993’s are sometimes left out (see Chapter. 6.3)
5 Bally Northwind Tool List Two people are required to assemble a Bally Northwind. The following list will assist you on the tools necessary in the
6 1. Locating the Blast Chiller 1.1. Using a chalk line and a carpenter’s square, locate on the building floor, the exact dimensions of the blas
7 3. Erection of Vertical Panels 3.1 BEFORE ATTEMPTING TO ERECT ANY PREFAB SECTIONS, FAMILIARIZE YOURSELF WITH THE FOLLOWING CHAPTERS IN THE STAN
8 3.3 On each panel, check for proper alignment and level. Leveling can be accomplished by placing wooden shims under the vertical panels (cross-r
9 5. Secure all Panel Sections 5.1 After all Speed-Loks are secured, install access hole plug buttons to all Speed-Lok locations. 5.2 Anchor both